David Yellin Auditorium Jerusalem, Israel, 1996
The spacious new 2,000 square meter auditorium was added adjacent to the old college building. The structure of the auditorium was built in the shape of a polygon with 8 sides of reinforced concrete with stone veneer. The building's hall is covered with a steel space frame construction, made by the Spanish company, DS. The seating area was made from concrete, and a gallery, which is supported by the building's facades, was added above. Access from the old building to the auditorium was added as well as stairs and an elevator. Copyright © 2024 - Luis Labaton & Partners Civil Engineers
created by Mark Media Group
|