The project was built adjacent to the historic David Yellin College. In the new 14,000 sq meter wing, is a 3 story underground parking, and above it classrooms, offices, assembly hall and cafeteria.


For the parking lot, a complicated 19 meter deep digging and retaining work was done, in order to protect the existing college building and residential buildings surrounding the site.

The building is made from reinforced concrete with stone veneer. In the top floors above the entrance level, a supporting steel construction was integrated in order to create a retreating stair pattern in the facade, between the floors.